+91 9337265469
Laxmi-Avenue                              Download Laxmi-Avenue Broucher

Site Development

Coming Soon
 

 

 

 

Specifications

1 Structure RCC frame structure.
    2 Super Structure 1st class KB bricks/fly ash bricks.
    3 Plastering All inside and out side wall shall be plastered in 1:6 Proportion and ceiling 1:4.
    4 Storage Space Suitable spaces and sizes shall be provided for cup boards.
    5 Door Frame Sal wood door frame of 5”× 2.5”
    6 Windows Alluminium glazed window with 5mm tinted glass and protective MS grill.
    7 Wall Finish Internal : putty finish with distemper.
    8 External Plaster finish with weather coat paint.
    9 Door All internal doors are factory made flush door of 32 mm thickness and main door is 32mm flush door with teak finishing.
   10 Flooring Rooms : Vitrified tiles 2’× 2’, Toilets : Anti skid 1’× 1’ ceramic tiles .
   11 Toilet Walls 12” ×8” Ceramic glazed tiles up to 7’ height.
   12 Kitchen Plaform Green Marble top with 2’ glazed tile cladding over the slab with stainless steel kitchen sink.
   13 Electricals All electrical wiring with premium brand fire resistant insulated copper wire/cable in concealed conduits. Switched & sockets of modular range. AC points in all bedrooms.
   14 Sanitary Hindware/Jaksons or equivalent hot and cold water provision in all bathrooms.
 
 
 
 
 
 

Facilities

  • 1. Common Securities.
  • 2. Separate Transformer for electric supply.
  • 3. Telephone outlets in each duplex.
  • 4. Cable TV outlets in each duplex.
  • 5. 24 hours security with guard room.
  • 6. Adequateventilation & pollution free environment.

Distance From LAXMI AVENUE

Rasulgarh Squares - 3.5 km
Hanspal Chhaka - 1 km
Utkal Heights - 2 km
Hitech Hospital- 2.5 km
Railway Station Vani Vihar - 4 km
Tata Motor - 1 km

 

Typical Floor Plans

   
   

 

Location

Payment

.    

PRICE LIST

Booking amount 5%
At the time of allotment and agreement 15%
At the time of land registration 15%
At the tme of foundation 10%
At the time of ground floor roof casting 10%
At the time of 1st floor roof casting 10%
At the time of plastering and all electrical and PH internal pipe wiring  10%
At the time of flooring and colouring 10%
At the time of door window fitting, PH and electrical switches fitting 10%
Before handover 5%

 

Walkthough