+91 9337265469
Laxmi Palace                            Download Laxmi Palace Broucher

Specifications

1 Structure RCC frame structure with pile foundation
  2 Brick Work K.B/ Concrete Block/ fly ash Bricks.
  3 Door Frame Sal Wood
  4 Inside Door Internal doors are of Company made flush doors
  5 Main Door Flush door with teak finish
  6 Windows Aluminum glazed with 5 tinted glass with protective M.S. Grill.
  7 Storage Space Suitable spaces Suitable spaces & sizes shall be provided for Cuo-Boards.
  8 Wall Ceramic Wall tiles upto 7’-0’’ heights in toilet and upto 2’-0’ height in kitchen. Green granite slab on kitchen platform with stainless steel kitchen sink.
  9 Painting All internal wall sare putty finished with one coat of primer and weather coat in Exterior walls.
  10 Flooring Vitrified Tiles.
  11 Electricals Fire resistant insulated copper wire/ cable in concealed conduits. Switches % Sockets of Modular range. A.C. Points in all Bed Rooms.
12
Sanitary Hind ware / Johnson or equivalent . Hot & Cold water provision in all Bath Rooms. C.P. Fitting of reputed make.
 
 
 
 
 
 

Facilities

  • 1. Standby generator for common utilities like common lights & supply.
  • 2. Water supply by deep bore well through separate over head reservoirs of adequate capacity.
  • 3. Separate transformer for electric supply.
  • 4. Lift of six persons for comfortable lifting in each block.
  • 5. Telephone outlets in each flat.
  • 6. Cable TV Outlet in each flat.
  • 7. Parking space for two wheelers in the stilt floor.
  • 8. Adequate ventilation & Pollution free environment.
  • 9. Security Gate and boundary wall.
  • 10. Society room with attached toilet.
  • 11. Security guard Room.
  • 17. Club House.

Distance From Laxmi palace

Hanspal - 1.5 km

Rasulgarh - 3.5km

Railway Station - 7.0 Km

 

Typical Floor Plans

   
   

 

Location

Payment

 

PRICE LIST

Booking amount 5%  
At the time of allotment and agreement 15%  
At the time of land registration 15%  
At the time of foundation 10%  
At the time of ground floor casting 10%  
At the time of 1st floor casting 10%  
At the time of plastering anjd all electrical and PH internal pipe wiring 10%  
At the time of flloring and colouring 10%  
At the time of door window fitting, PH and electrical switches fitting 10%  
Before handover 5%  

 

Walkthough