+91 9337265469
Laxmi Residency2                            Download Laxmi Residency II Broucher

Site Development

Comming Soon

 

Specifications

     
1 structure RCC frame structure with pile foundation.
    2 Brick Work Fly ash bricks.
    3 Door frame Sal wood (5”×2 ⅟2”).
   4 Inside Door All Internal doors are of Company made flush doors
   5 Main door Solid teak with Godrej lock.
   6 Windows Alluminium glazed window with 5mm tinted glass and protective MS grill.
   7 Walls Ceramic wall tile upto 7’ -0” height in all bathrooms.
   8 Painting Putty finished with one coat primer and color. Weather coat  in exterior walls.
   9 Kitchen Granite slab in kitchen platform with stainless steel kitchen sink. 2’ height ceramic wall tile.
  10 Flooring Vitrified Tiles in all rooms Anti  skid tiles in all bathrooms.
  11 Electricals Fire resistant insulated copper wire/cable in concealed conduits. Switches & sockets of Modular range. A.C. Points in all Bed Rooms.
  12 Sanitary Hot and cold water provision in all bathrooms. C.P. Fitting are of Hindware/equivalen company.
 
 
 

Facilities

  • 1. Standby generator for common utilities like Lift, common lights & each flat 250 Watt supply.
  • 2. Water supply by deep bore well through separate over head reservoirs of adequate capacity.
  • 3. Separate transformer for electric supply
  • 4. 2 Nos ofLift of six persons for comfortable lifting in each block.
  • 5. Telephone outlets in each flat
  • 6. Cable TV outlets in each flat
  • 7. Parking space for two wheelers in the stilt floor.
  • 8. Adequate ventilation and pollution free environment
  • 9. 24 hours security with CC Camera.
  • 10. Security Guard room
  • 11. Gym
  • 12. Community Hall

Distance from Laxmi Residency- II.

  Rasulgarh Square : 3.5 Km
  Hanspal Chhaka 1.0 Km
  Utkal Heights 2.0 Km
  Hitech Hospital 2.5 Km
  Railway Station Vani Vihar : 4.0 Km
     

 

 

Typical Floor Plans

   
   

 

Location

Payment

 

PRICE LIST

Booking amount 5%
On execution of allotment and agreement 15%
On Completion of foundation 10%
On Completion of stilt floor roof slab 10%
 On Completion of 1st floor roof slab 10%
 On Completion of 2nd floor roof slab 10%
On Completion of 3rd floor roof slab 10%
On Completion of 4th floor roof slab 5%
Towards completion of brick work and plastering 10%
Towards completion of flooring and finishing 10%
Upon completion and Before registration 5%

 

Walkthough