puri canal rood , Balianta, Bhubaneswar, Odisha 752101
1 | Structure | RCC frame structure with pile foundation |
2 | Super Structure | Fly ash bricks |
---|---|---|
3 | Plastering | All inside and outsite wall shall be plasterred in 1:6 proportion and ceiling 1:4 |
4 | Storage Space | Suitable spaces Suitable spaces & sizes shall be provided for Cuo-Boards. |
5 | Door Frame | Sal wood door |
6 | Windows | UPVC 5mm tinted glass |
7 | Wall Finish | Ceramic wall tiles up to 7′ height in all bathrooms |
8 | External | Plaster finish with weather coat paint |
9 | Door | Main Door- polished solid teak wood Godrej lock, All internal doors are of factory made flush with mica paste. |
10 | Flooring | Vitrified Wooden Flooring tiles in master bedroom. Vitrified floor tiles in other bedrooms and drawing & dinning Area. Granite Staircase & all window frame area .Polished Granite on lift fascia.Protective Anti-skid Flooring in all bathroom Area |
11 | Kitchen Plaform | Granite slab in cooking platfrom with stainless steel kitchen sink, 2′ height cermic wall tile. |
12 | Electricals | Fire resistant insulated copper wire/ cable in concealed conduits. Switches % Sockets of Modular range. A.C. Points in all Bed Rooms. |
13 | Sanitary | Hind ware / Johnson or equivalent . Hot & Cold water provision in all Bath Rooms. C.P. Fitting of reputed make. |
1 | Community Center |
2 | Tennis Court |
3 | Jogging Track |
4 | 24 hour security with security guard room |
5 | One gate community |
6 | Transformer Facility |
7 | 30’ Main concrete road |
8 | 25’ Concrete Sub- road |
9 | 2’ Wide drain |
10 | Temple with children park |
11 | Street Light |
12 | Adequate Plantation |
13 | Eco-friendly Environment |
1 | Booking amount 05% |
2 | On execution of agreement and allotment 15% |
3 | On Completion of Foundation 10% |
4 | On Completion of stilt floor roof slab 10% |
5 | On Completion of 1st roof slab 10% |
6 | On Completion of 2nd roof slab 10% |
7 | On Completion of 3rd roof slab 05% |
8 | On Completion of 4th roof slab 05% |
9 | On Completion of 5th roof slab 10% |
10 | Towards completion of brick work & Plastering 05% |
11 | Towards completion of Flooring & Finishing 10% |
12 | Upon completion & before Registration 05% |
Rasulgarh Square | 3.5 Km |
Hi-Tech Hospital | 1.5 km |
Simphony Mail | 0.1 km |
Mother’s Public School | 2.0 km |
DPS Kalinga | 7.0 km |
Copyright © 2023 All rights reserved.
Copyright © 2023 All rights reserved.