Puri canal rood, hanspal, Bhubaneswar, Odisha 752106
1 | Structure | RCC frame structure with pile foundation. |
2 | Brick Work | Fly Ash Bricks. |
3 | Door Frame | Sal Wood (5″x2 1/2″) |
4 | Door | All internal doors are of company made flush door. |
5 | Main Door | Solid teak wood with Godrej lock. |
6 | Windows | UPVC 5mm tinted glass. |
7 | Walls | Ceramic Wall tiles up to 7’ height in all bathrooms. |
8 | Painting | Putty finish with one coat primer and color. weather coat in Exterior walls. |
9 | Kitchen | Granite slab in cooking platform with stainless steel kitchen sink. 2’ height ceramic wall tile. |
10 | Flooring | Vitrified tiles in all rooms. Anti skid tiles in all bathrooms. |
11 | Electricals | Fire resistant insulated copper wire/cable in concealed conduits. Switches & Sockets of Modular range. A.C Points in all Bedrooms. |
12 | Sanitary Fittings | Hot and cold water provision in all bathrooms and all CP Fittings are Hindware/equivalent Company. |
1 | Grand Entrance Gate |
2 | Secued Walled Campus |
3 | Adequate Street Light |
4 | Efficient Drainage system |
5 | Overhead Water Storage |
6 | Power Back-up System |
7 | Digutal Intercom Facility |
8 | Close Cicuit Camera |
9 | Fire Fighting System |
10 | Sewage Treatment Plant |
1 | On application for booking 5% |
2 | On execution of Agreement & Allotment 15% |
3 | On Completion of Foundation work 10% |
4 | On completion of Stilt floor Roof Slab 10% |
5 | On completion of 1st floor Roof Slab 10% |
6 | On completion of 2nd floor Roof Slab 10% |
7 | On completion of 3rd floor Roof Slab 10% |
8 | On completion of 4th floor Roof slab 5% |
9 | Towards completion of brick work and plastering 10% |
10 | Towards completion of Flooring & finishing 10% |
11 | Upon completion and before registration 5% |
Rasulgarh Square | 3.5Km |
Hanspal Chhak | 1Km |
Utkal Hights | 2Km |
Hitech Hospital | 2.5Km |
Railway Station | 5Km |