Bada Jharila, Phulnakhara, Odisha 754002
1 | Structure | RCC frame structure with pile foundation |
2 | Super Structure | 1st class KB bricks/fly ash bricks |
---|---|---|
3 | Plastering | All inside and outsite wall shall be plasterred in 1:6 proportion and ceiling 1:4 |
4 | Storage Space | Suitable spaces Suitable spaces & sizes shall be provided for Cuo-Boards. |
5 | Door Frame | Sal wood door frame of 5″X2.5″ |
6 | Windows | Aluminum glazed with 5 tinted glass with protective M.S. Grill. |
7 | Wall Finish | Internal Putty Finish with distemper |
8 | External | Plaster finish with weather coat paint |
9 | Door | All internal Door are factory made flush door of 32mm thickness and main door is 32mm flush door with teak finishing |
10 | Flooring | Rooms: vitrified 2″ Toilets” Anti skid 1’X1 ceramic titles |
11 | Kitchen Plaform | Kitchen Plaform |
12 | Electricals | Fire resistant insulated copper wire/ cable in concealed conduits. Switches % Sockets of Modular range. A.C. Points in all Bed Rooms. |
13 | Sanitary | Hind ware / Johnson or equivalent . Hot & Cold water provision in all Bath Rooms. C.P. Fitting of reputed make. |
1 | Community Center |
2 | Tennis Court |
3 | Jogging Track |
4 | 24 hour security with security guard room |
5 | One gate community |
6 | Transformer Facility |
7 | 30’ Main concrete road |
8 | 25’ Concrete Sub- road |
9 | 2’ Wide drain |
10 | Temple with children park |
11 | Street Light |
12 | Adequate Plantation |
13 | Eco-friendly Environment |
1 | Booking and Agreement 20% |
2 | 1st installment 25%, 45 days from of booking |
3 | 2nd installment 25%, 90 days from of booking |
4 | 3rd installment 25%, 150 days from of booking |
5 | All The time of registration 5% |
Phulnakhara | 10Km |
DPS Kalinga | 8Km |
Ocean World | 1Km |
Bhubaneswar | 17 km |
Cuttack | 18 km |
Copyright © 2023 All rights reserved.
Copyright © 2023 All rights reserved.