Atala, Hanspal, Jagannathpur, Odisha 752101
1 | Structure | RCC frame structure. |
2 | Brick Work | Fly Ash Bricks. |
3 | Door Frame | Sal Wood. |
4 | Internal Door | All internal doors are of factory made flush door and main |
5 | Main Door | Flush rood with teak finishing. |
6 | Windows | Aluminum glazed windows with 5mm tinted glass and Protective MS grill. |
7 | Walls | Ceramic Wall tiles up to 7’ height in all bathrooms. |
8 | Storage Space | Suitable space & sizes shall be provided for Cup-Boards. |
9 | Painting | All Internal walls are putty finished with one coat of primer and weather coat in Exterior walls. |
10 | Kitchen | Granite slab in cooking platform with stainless steel kitchen sink. 2’ height ceramic wall tile. |
11 | Flooring | Vitrified tiles in all rooms. Anti skid tiles in all bathrooms. |
12 | Electricals | Fire resistant insulated copper wire/cable in concealed conduits. Switches & Sockets of Modular range. A.C Points in all Bedrooms. |
13 | Sanitary Fittings | Hot and cold water provision in all bathrooms and all CP Fittings are Hindware/equivalent Company. |
1 | Standby generator for common utilities like common lights & water supply. |
2 | Water supply by deep borewell through separate over head reservoirs of adequate capacity. |
3 | Separate transformer for electricity supply. |
4 | Lift for six persons for comfortable lifting in each block. |
5 | Telephone outlets in each flat. |
6 | Cable TV outlets in each flat. |
7 | Parking space for two wheelers in the still floor. |
8 | Adequate ventilation & pollution free environment. |
9 | 24 hour security with guard room. |
1 | On application for booking 5% |
2 | On execution of Agreement & Allotment 15% |
3 | On Completion of Foundation work 10% |
4 | On completion of Stilt floor Roof Slab 10% |
5 | On completion of 1st floor Roof Slab 10% |
6 | On completion of 2nd floor Roof Slab 10% |
7 | On completion of 3rd floor Roof Slab 5% |
8 | On completion of 4th floor Roof slab 5% |
9 | On completion of 5th floor Roof slab 5% |
10 | Towards completion of brick work and plastering 10% |
11 | Towards completion of Flooring & finishing 10% |
12 | Upon completion and before registration 5% |
DPS | 3Km |
Hanspal Chhak | 4Km |
EAST College | 4Km |
Utkal Hights | 2Km |
Hitech Hospital | 5Km |
Water Park | 4Km |
Railway Station | 6.5Km |
Copyright © 2023 All rights reserved.
Copyright © 2023 All rights reserved.